The validate interface

  • This is the system that applies the scheduling and validating algorithm. No campaign can be scheduled without this interface. For each commercial scheduled in the scheduling interface a final check is made, for the strong conflicts (the position and class conflicts) and for the week conflicts (duration and follow-up conflicts). The strong conflicts encountered are signaled with red. The other conflicts are signaled according to the color code, but are accepted. The strong conflicts cannot be avoided and an attempt to save a scheme with strong conflicts will fail.
  • To discover details about the conflict, click the colored square from the validating interface and in the inferior part of the interface the details will be shown.
  • After solving the strong conflicts, the scheme can be saved.
  •